Description Of Services

Yooshin Engineering Corporation and Dohwa Engineering Co., Ltd funded this landmark infrastructure feasibility study. As a specialized Expressway Impact Survey Firm AIR Ltd company, we collaborated with Maxwell Stamp Ltd. to execute extensive socio-economic data collection frameworks. Our studies focused specifically on creating an advanced impact model along the proposed Dhaka-Mymensingh Expressway (DME) PPP Corridor.

  • Description Of Services

    As a highly capable survey firm, research firm, and consultancy firm, AIR Ltd successfully executed the following project phases:

    1. Development of Field Survey Plan

    First, our expert transport planners designed a comprehensive field survey plan to maximize data collection efficiency. This strategic document defined the study’s exact scope and selected high-impact zones along the DME Highway. Furthermore, we aligned each method with the feasibility study’s long-term modeling goals to ensure robust results.

    2. Recruitment and Deployment of Field Personnel

    Next, this consultancy firm successfully identified, recruited, and deployed the required number of qualified field staff. Our human resource process focused on choosing enumerators with explicit experience in conducting complex socio-economic assessments. Consequently, AIR Ltd formed a highly professional team capable of managing massive community-level data collection.

    3. Conducting Targeted Training Sessions

    Subsequently, our research firm designed and delivered specialized training sessions for the selected field personnel. These interactive modules covered advanced interview techniques, strict data collection methods, and project-specific safety protocols. Therefore, our team maintained absolute consistency and data accuracy during the entire fieldwork timeline.

    4. Execution of Interview Surveys Along the Proposed DME Corridor

    Afterward, our Expressway Impact Survey AIR team conducted structured face-to-face interview surveys across the highway periphery. Our enumerators interacted directly with local residents, business owners, and commercial stakeholders along the corridor. As a result, we captured critical socio-economic indicators necessary for calculating potential displacement and development impacts.

    5. Data Processing, Cleaning, and Submission

    Finally, our data analytics division meticulously compiled, cleaned, and processed the collected field data using advanced statistical software. We cross-referenced all survey entries to eliminate discrepancies before integrating them into the final impact model. Ultimately, AIR Ltd submitted the verified datasets alongside comprehensive reports that effectively supported the feasibility study’s objectives.

Project Information

Project Name

Socio-Economic Impact Modelling for the Feasibility Study for the Dhaka-Mymensingh Expressway (DME) PPP Project

Client:

Maxwell Stamp Ltd.

Funding/ Implementing Agency

Yooshin Engineering Corporation & Dohwa Engineering Co., ltd

Location:

Dhaka, Mymensingh

Date:

December 2022 - June 2023

Website:

www.maxwellstampltd.com

Collaboration and Professional Network

Learn more about Action for Innovative Resource Ltd. or explore collaboration opportunities through Work With Us.

Connect with AIR professionally through Action for Innovative Resource Ltd on LinkedIn to explore the company’s latest research initiatives, consultancy services, and professional network.